Skip to content

Code compliance check

Last reviewed:
The verification that a design satisfies the requirements of the codes, standards and regulations that apply to it, traced clause by clause to the documents that demonstrate compliance.

A compliance check has two halves, and the first is the one that gets skipped: establishing exactly which documents apply. The applicable set depends on jurisdiction, facility type, hazard category and date, and it shifts as standards are amended and superseded. Checking a design diligently against the wrong edition is a common and expensive way to be wrong.

The second half is the tracing. For each applicable requirement, compliance lives somewhere specific — a dimension on a drawing, a value in a calculation, a material in a specification — and the check connects clause to evidence. Designers self-check as they work, independent reviewers and authorities re-check with fresh eyes, and regulated industries formalise the whole exercise as compliance matrices maintained through the project.

The failure mode is that the tracing is manual, voluminous and perishable. A design revision can silently invalidate a compliance demonstration made three months earlier, and a matrix maintained by hand drifts from the documents it indexes. Most compliance findings in formal review are not exotic engineering judgements; they are exactly this drift, found by someone paid to look.

See this workflow in practice.

Book a demo to see how Armeta applies this concept across the drawings, standards, specifications, and project data that define the work.