Handover package

Last reviewed:
The structured set of documentation transferred from the project to the owner at completion — as-builts, vendor documents, certificates, test records and operating information — constituting the asset's permanent record.

When a project ends, the asset begins, and the handover package is what the asset gets to keep: as-built drawings and models, vendor manuals and datasheets, material and welding certificates, inspection and test records, commissioning results, permits and regulatory conclusions, spare parts data. The contents and structure are specified by the contract and the owner's information requirements, in some industries against formal information standards; completion of the package is typically tied to payment milestones, which is frequently the only reason it gets finished.

The package's real customer is time. Operations runs on it, regulators audit against it, and decades of future maintenance, integrity management and modification projects will treat it as the ground truth about the facility. A certificate that cannot be found in year fifteen is, functionally, a component with no provenance.

It fails the way as-builts fail, and for the same reason: assembled at the end, from whatever survived, by whoever is left. Owners who treat handover as a continuous obligation — documents delivered, verified and indexed progressively through execution — get an asset record; owners who treat it as a closing formality get boxes.

See this workflow in practice.

Book a demo to see how Armeta applies this concept across the drawings, standards, specifications, and project data that define the work.