Hold

Last reviewed:
A marked restriction meaning "do not proceed past this point without resolution" — applied on drawings to areas pending information, and in inspection plans to work stages requiring sign-off before continuing.

The word carries two related instruments, and this glossary's intro warned you about words like this. On documents, a hold is a clouded area of a drawing marked HOLD, flagging content that is unresolved — awaiting vendor data, a pending decision, an unconfirmed interface — on a document otherwise mature enough to issue. The hold list is tracked, and each hold is a small debt: the drawing is usable everywhere except the one place it isn't.

In quality plans, a hold point is a stage in the work — before the concrete pour, before the weld is covered — past which the contractor may not proceed until a designated party has inspected and released it. Its softer sibling, the witness point, requires notification but allows work to continue; the hold point stops the job. The distinction is who bears the cost of proceeding: past a witness point, the inspector missed it; past a hold point, the contractor broke it.

Both instruments fail the same way — under schedule pressure. Documents get issued for construction with holds still open, transferring the unresolved question to the field; hold points get worked through with the release signature collected afterwards. In each case the mechanism functioned perfectly as paperwork and not at all as control.

See this workflow in practice.

Book a demo to see how Armeta applies this concept across the drawings, standards, specifications, and project data that define the work.